ADNOC selected OQC for a long-term contract to provide civil maintenance work for pipelines and facilities.
Our scope covered the concrete repair of existing equipment and pipe support foundations, pipe trench, pedestals, culverts, pits, building refurbishment and fencing at several locations along the pipeline network, such as Asab, Bab, Habshan, Maqta, Jebel Ali and Al Ain areas.
Repair works included concrete surface improvement, demolition and replacement of heavily deteriorated concrete elements, removal of existing damaged gravel layer and interlock in the station and supply and installation of a new one